Main construction design for the access road for the Firefighter Unit St. Rok L= 0,5 km

March 16, 2017

67.jpg
Main construction design for the access road for the Firefighter Unit St. Rok L= 0,5 km

Description of actual services provided by the firm in the assignment:

  • Main construction design
  • Technical description
  • Determining category of the road
  • Determining project speed
  • Determining ground plans for the road
  • Determining longitudinal section
  • Determining cross section of the road
  • Drainage system according to longitudinal and cross section
  • Pavement structure design
  • Quality control and quality assurance program